Skip to main content
Hoheikyo Dam

Photo: Aki 。.

|

Hoheikyo Dam

viewpoint

Hoheikyo Dam

豊平峡ダム

4.3Est. 1 hrJozankei, Hokkaido

Read about Ma (the space between)

Overview

102-meter arch dam in a deep gorge five kilometers south of Jozankei, accessed by a one-stop electric shuttle bus or a 2-kilometer walk in (no private cars).

Hoheikyo Dam is a thin-arch dam completed in 1972, holding back the Toyohira River in a steep andesite canyon. Private cars are not allowed past the shuttle base; visitors take the seasonal electric bus or walk the 2 km in. From the dam crest, an observation lift goes up to a higher overlook with the canyon framed against the central Sapporo silhouette in the distance. Mid-October peaks the autumn foliage view; the trail and shuttle close from late November through April.

Practical info

Japanese name
豊平峡ダム
Loading details...

Want to visit Hoheikyo Dam?

Build a trip to Jozankei